Completed project – Miller Park; Milwaukee, WI (Milwaukee Brewers)

type your text for first image here

Completed project – Miller Park; Milwaukee, WI (Milwaukee Brewers)

Design and installation of warning track wetting system at Miller Park.

type your text for second image here

Design and installation of warning track wetting system at Miller Park.

Removal of existing turf and organics at Miller Park.

FIELDS built the playing field for this outdoor stadium in Minneapolis. >>Read more

Removal of existing turf and organics at Miller Park.

The internal infield turf at Miller Park remained.

We were honored to partner with Chevrolet, Major League Baseball and Scotts to renovate five youth baseball fields last fall. >>Read more

The internal infield turf at Miller Park remained.

Miller Park – Turf overlay, trimmed to fit.

Tight deadlines were no match for the FIELDS team on this project. >>Read more

Miller Park – Turf overlay, trimmed to fit.

Foul territory at Miller Park, laser graded and screened.

Green Bay Packers' training facility received a complete renovation and conversion from synthetic to natural turf fields. FIELDS also worked with the organization to create an improved "Packer Fan" experience. >>Read more

Foul territory at Miller Park, laser graded and screened.

Complete turf installation under intense shade.

type your text for 7th image here

Complete turf installation under intense shade.

Repair of irrigation valves at Miller Park.

type your text for 8th image here

Repair of irrigation valves at Miller Park.

Scope of Work

The work on this project entailed replacing the natural turfgrass outfield, which had become inconsistent due to the shade provided by the ball park’s signature retractable roof, resulting in unpredictable playing conditions.

Miller Park

Location: Milwaukee, Wisconsin

Owner: Milwaukee Brewers

Sportsfield Designer: Design Build

Completed: December 2008


Miller Park boasts the only fan-shaped retractable roof in North America, and is one of the few Major League Baseball parks with retractable roofs and natural grass fields. The convertible roof ensures perfect climate conditions for games, but the total or partial shade the roof provides contributed significantly to inconsistent growth in the outfield turf. The condition of the thatch layer and organic build-up between the grass and soil surface sparked concerns regarding footing, ball bounce and ball roll, and the field was scheduled for replacement after the 2008 National League Championship Series.

 

FIELDS removed the existing turfgrass and the organic matter layer, and installed additional USGA growing medium. We then performed specific and detailing laser grading as directed by the Milwaukee Brewers in order to meet their objectives for the project.

 

Prior to installing the new turf, the existing irrigation system was modified. FIELDS designed the modified system in zones in order to maintain adequate moisture levels in all areas of the warning track, whether they were in full sun or in the shade. To restore the track once the irrigation was added, we installed additional warning track material and laser graded the track.

 

FIELDS completed the project with the installation of the new turfgrass, and selected a special bluegrass turf grown to the desired maturity to suit the needs of this special environment. The playing surface was ready for Opening Day in the spring of 2009.